This depends on the type of exhibition stand system that you are using, the size of the stand, and the number of custom and bespoke features.
For small modular exhibition stands, you might be able to set up in just a few hours, but with larger stands with lots of features, you may want to allow up to two days to complete the build.
You can plan how long the build will take by conducting a full pre-build.
Custom-built stands, which can only be handled by a professional, might take much longer than modular alternatives.